| [1] |
ZHANGKai, ZHANGShousen, QIDelu.Design and Research of the Ballastand De-Ballast Systemof Semi-Submersible Production and Storage Platforms[J]. Ocean Engineering Equipment and Technology, 2022, 9(1): 15-20. |
| [2] |
HAN Jing-yan, ZHAO Qiang, WU Bin-bin, JIANG Yu-fei, YUAN Guo-dong.How to Improve the Bearing Capacity of Lifting Point for Jacket Removal[J]. Ocean Engineering Equipment and Technology, 2019, 6(1): 444-449. |
| [3] |
SU Jian , LIU Bao-sheng , YANG Bao-jian, MA Li, CAO Yan-guo.Application of Asymmetric Underwater Drilling Baseplate in Exploration and Development of Marginal Oilfield in Bohai[J]. Ocean Engineering Equipment and Technology, 2018, 5(5): 305-308. |
| [4] |
JING Peng, ZHAO Guo-hua, YANG Qing-feng, LI Chun-lei, LIU Rong-kun.Method of Dimensional Control for Vertically Constructed Jacket[J]. Ocean Engineering Equipment and Technology, 2018, 5(5): 339-345. |
| [5] |
SUN Jing, WANG Chun-sheng, SHANG Chao, ZHENG Xiao-peng.Localization Prototype Design of Dual-Fuel Direct-Fired Inert Gas Generator for FPSO[J]. Ocean Engineering Equipment and Technology, 2018, 5(4): 248-251. |
| [6] |
LIU Rong-kun, YANG Qing-feng, LI Jia-jun, CAO Hong-tao, WANG Xin, WANG Tian-yi, JING Peng.Application of Three-Dimensional Coordinate System to Dimensional Control of Large-Scale Modules[J]. Ocean Engineering Equipment and Technology, 2018, 5(4): 274-277. |
| [7] |
HUANG Huai-zhou, LIU Zhao, LIU Yu-xi.Research on Allowable Deflection Envelope of Barge/Yard Skidway During the Skidded Loadout of Jacket[J]. Ocean Engineering Equipment and Technology, 2018, 5(4): 278-282. |
| [8] |
HE Yang.Equipment Selection for the Air-Conditioning System of Deepwater Semi-Submersible Drilling Rig[J]. Ocean Engineering Equipment and Technology, 2018, 5(3): 202-207. |
| [9] |
CHEN Zi-jing.H2S Variation Trends in Produced Water Treatment System of Offshore Oil Field[J]. Ocean Engineering Equipment and Technology, 2018, 5(1): 20-23. |
| [10] |
LI Long-xiang, YE Yong-biao, FU Fang-chao, XU Meng-meng, CAO Chen-lei.Research on Deepwater Pipeline Coating Removal Equipment for 2000 m Water Depth[J]. Ocean Engineering Equipment and Technology, 2018, 5(1): 63-66. |
| [11] |
CHEN Rong-qi, PENG Xiao-jia.Current Status and Characteristics of Semi-Submersible Crane and Pipe-Laying Vessel[J]. Ocean Engineering Equipment and Technology, 2017, 4(6): 317-321. |
| [12] |
ZHONG Wen-jun, PENG Xiao-jia, HE Ning.Outline of General Arrangement for Semi-Submersible Crane and Pipe-Laying Vessel[J]. Ocean Engineering Equipment and Technology, 2017, 4(6): 322-325. |
| [13] |
HE Ning, ZHAO Dang, WANG Hui.Study on Pipeline J-Lay Analysis with Deepwater Semi-Submersible Crane J-Lay Vessel[J]. Ocean Engineering Equipment and Technology, 2017, 4(6): 326-330. |
| [14] |
ZHANG Fa-fu.Dynamic Positioning Capability Analysis of Semi-Submersible Crane and Pipe-Laying Vessel[J]. Ocean Engineering Equipment and Technology, 2017, 4(6): 331-337. |
| [15] |
ZHAO Jie, PENG Xiao-jia, HE Ning, AN Da-wei.Functional Requirement Analysis for the Deepwater Heavy Lifting Operation[J]. Ocean Engineering Equipment and Technology, 2017, 4(6): 338-342. |