
Ocean Engineering Equipment and Technology››2018,Vol. 5››Issue (4): 274-277.doi:10.12087/oeet.2095-7297.2018.04.09
Previous ArticlesNext Articles
LIU Rong-kun, YANG Qing-feng, LI Jia-jun, CAO Hong-tao, WANG Xin, WANG Tian-yi, JING Peng
Received:2018-01-04Revised:2018-03-27Online:2018-08-25Published:2018-08-20CLC Number:
LIU Rong-kun, YANG Qing-feng, LI Jia-jun, CAO Hong-tao, WANG Xin, WANG Tian-yi, JING Peng. Application of Three-Dimensional Coordinate System to Dimensional Control of Large-Scale Modules[J]. Ocean Engineering Equipment and Technology, 2018, 5(4): 274-277.
| 1 张志宽. 大型导管架三维坐标控制网尺寸控制技术初步分析[J]. 中国造船, 2012, 53(增2): 86. Zhang Zhi-kuan. Preliminary analysis of huge jacket dimension control technology using three-dimensional coordinates control net [J]. Shipbuilding of China, 2012, 53(S2): 86. 2 杨现阳, 王亚男, 荆鹏, 等. 超大型海洋平台建造尺寸控制工艺探讨[J]. 中国造船, 2014, 55(增1): 340. Yang Xian-yang, Wang Ya-nan, Jing Peng, et al. Dimension control technology for fabrication of super platform [J]. Shipbuilding of China, 2014, 55(S1): 340. 3 孙云虎, 李海峰, 荆鹏. 深水导管架尺寸控制工艺探讨[J]. 中国造船, 2013, 54(增2): 144. Sun Yun-hu, Li Hai-feng, Jing Peng. The study on dimensional control procedure for deep water jacket [J]. Shipbuilding of China, 2013, 54(S2): 144. 4 孙丕松, 李凡, 潘庆敏. 大型LNG模块一体化联合建造计划研究[J]. 中国石油和化工标准与质量, 2017, 37(4): 25. Sun Pi-song, Li Fan, Pan Qing-min. Research on the integration construction planning of large-scale LNG modules [J]. China Petroleum and Chemical Standards and Quality, 2017, 37(4): 25. 5 刘荣坤, 李家军, 田从永, 等. LNG钢结构模块沉降分析及修正研究[J]. 海洋工程装备与技术, 2017, 4(4): 240. Liu Rong-kun, Li Jia-jun, Tian Cong-yong, et al. Research on module settlement and adjustment of LNG steel project [J]. Ocean Engineering Equipment and Technology, 2017, 4(4): 240. |
| [1] | ZHANGKai, ZHANGShousen, QIDelu.Design and Research of the Ballastand De-Ballast Systemof Semi-Submersible Production and Storage Platforms[J]. Ocean Engineering Equipment and Technology, 2022, 9(1): 15-20. |
| [2] | HAN Jing-yan, ZHAO Qiang, WU Bin-bin, JIANG Yu-fei, YUAN Guo-dong.How to Improve the Bearing Capacity of Lifting Point for Jacket Removal[J]. Ocean Engineering Equipment and Technology, 2019, 6(1): 444-449. |
| [3] | SU Jian , LIU Bao-sheng , YANG Bao-jian, MA Li, CAO Yan-guo.Application of Asymmetric Underwater Drilling Baseplate in Exploration and Development of Marginal Oilfield in Bohai[J]. Ocean Engineering Equipment and Technology, 2018, 5(5): 305-308. |
| [4] | JING Peng, ZHAO Guo-hua, YANG Qing-feng, LI Chun-lei, LIU Rong-kun.Method of Dimensional Control for Vertically Constructed Jacket[J]. Ocean Engineering Equipment and Technology, 2018, 5(5): 339-345. |
| [5] | SUN Jing, WANG Chun-sheng, SHANG Chao, ZHENG Xiao-peng.Localization Prototype Design of Dual-Fuel Direct-Fired Inert Gas Generator for FPSO[J]. Ocean Engineering Equipment and Technology, 2018, 5(4): 248-251. |
| [6] | HUANG Huai-zhou, LIU Zhao, LIU Yu-xi.Research on Allowable Deflection Envelope of Barge/Yard Skidway During the Skidded Loadout of Jacket[J]. Ocean Engineering Equipment and Technology, 2018, 5(4): 278-282. |
| [7] | HE Yang.Equipment Selection for the Air-Conditioning System of Deepwater Semi-Submersible Drilling Rig[J]. Ocean Engineering Equipment and Technology, 2018, 5(3): 202-207. |
| [8] | CHEN Zi-jing.H2S Variation Trends in Produced Water Treatment System of Offshore Oil Field[J]. Ocean Engineering Equipment and Technology, 2018, 5(1): 20-23. |
| [9] | LI Long-xiang, YE Yong-biao, FU Fang-chao, XU Meng-meng, CAO Chen-lei.Research on Deepwater Pipeline Coating Removal Equipment for 2000 m Water Depth[J]. Ocean Engineering Equipment and Technology, 2018, 5(1): 63-66. |
| [10] | CHEN Rong-qi, PENG Xiao-jia.Current Status and Characteristics of Semi-Submersible Crane and Pipe-Laying Vessel[J]. Ocean Engineering Equipment and Technology, 2017, 4(6): 317-321. |
| [11] | ZHONG Wen-jun, PENG Xiao-jia, HE Ning.Outline of General Arrangement for Semi-Submersible Crane and Pipe-Laying Vessel[J]. Ocean Engineering Equipment and Technology, 2017, 4(6): 322-325. |
| [12] | HE Ning, ZHAO Dang, WANG Hui.Study on Pipeline J-Lay Analysis with Deepwater Semi-Submersible Crane J-Lay Vessel[J]. Ocean Engineering Equipment and Technology, 2017, 4(6): 326-330. |
| [13] | ZHANG Fa-fu.Dynamic Positioning Capability Analysis of Semi-Submersible Crane and Pipe-Laying Vessel[J]. Ocean Engineering Equipment and Technology, 2017, 4(6): 331-337. |
| [14] | ZHAO Jie, PENG Xiao-jia, HE Ning, AN Da-wei.Functional Requirement Analysis for the Deepwater Heavy Lifting Operation[J]. Ocean Engineering Equipment and Technology, 2017, 4(6): 338-342. |
| [15] | ZHAO Jian-yu, TANG Yi.Application of Closed-Ring Power System in Large Engineering Vessel[J]. Ocean Engineering Equipment and Technology, 2017, 4(6): 343-346. |
| Viewed | ||||||
| Full text |
|
|||||
| Abstract |
|
|||||