| [1] |
ZHANG X F, YU G, HU Z Y, et al. Parallel disassemblysequence planning for complex products based onfuzzy-rough sets [J]. The International Journal of AdvancedManufacturing Technology, 2014, 72(1-4): 231-239. |
| [2] |
MIN S S, ZHU X J, ZHU X. Mechanical product disassemblyand/or graph construction [C]//InternationalConference on Measuring Technology and MechatronicsAutomation. Changsha, China: IEEE, 2010: 627-631. |
| [3] |
PETER M, WANG C G, CHEN J T. Virtual disassemblysequences generation and evaluation [J]. ProcediaCIRP, 2016, 44(1): 347-352. |
| [4] |
MAROUA K, MOEZ T, NIZAR A. Disassembly sequenceplanning based on a genetic algorithm [J]. Proceedingsof the Institution of Mechanical Engineers,Part C: Journal of Mechanical Engineering Science,2015, 229(12): 2281-2290. |
| [5] |
PORNSING C, WATANASUNGSUIT A. A discreteparticle swarm optimization for disassembly sequenceplanning [C]//IEEE International Conferenceon Management of Innovation and Technology. London,UK: IEEE, 2014: 480-485. |
| [6] |
ZHANG X H, TIAN L. Selective disassembly sequenceplanning based on ant colony algorithm [C]//7th InternationalConference on System of Systems Engineering.Genova, Italy: IEEE, 2012: 236-239. |
| [7] |
LU C, LIU Y C. A disassembly sequence planning approachwith an advanced immune algorithm [J]. Proceedingsof the Institution of Mechanical Engineers,Part C: Journal of Mechanical Engineer Science, 2012,226(11): 2739-2749. |
| [8] |
LIU Z F, YANG D J, GU G G. Disassembly sequenceplanning based on particle swarm-simulated annealingoptimization [J]. Journal of Hefei University of Technology:Natural Science Edition, 2011, 34(2): 161-165(in Chinese). |
| [9] |
YEH W C, WEI S C. Simplified swarm optimizationin efficient tool assignment of disassembly sequencingproblem [C]//IEEE Congress on Evolutionary Computation.Cancun, Mexico: IEEE, 2013: 2712-2719. |
| [10] |
YEH W C. Simplified swarm optimization in disassemblysequencing problems with learning effects [J].Computers & Operation Research, 2012, 39(9): 2168-2177. |
| [11] |
SONG S X, ZHANG W S, ZHANG L. Product disassemblysequence planning based on improved artificialbee colony algorithm [J]. China Mechanical Engineering,2016, 27(17): 2384-2390 (in Chinese). |
| [12] |
XIA K, GAO L, LI W D, et al. Disassembly sequenceplanning using a simplified teaching-learning-based optimizationalgorithm [J]. Advanced Engineering Informatics,2014, 28(4): 518-527. |
| [13] |
YANG X S. A new metaheuristic bat-inspired algorithm[C]//Nature Inspired Cooperative Strategiesfor Optimization (NICSO 2010). Berlin, German:Springer, 2010: 65-74. |
| [14] |
YANG X S, AMIR H G. Bat algorithm: a novel approachfor global engineering optimization [J]. EngineeringComputations, 2012, 29(5): 464-483. |
| [15] |
ZHAO Y X, YANG X S, LIU L Q. New meta-heuristicoptimization algorithms [M]. Beijing, China: SciencePress, 2013: 313-314 (in Chinese). |
| [16] |
YASSINE S,MOHMMED E R. A novel discrete bat algorithmfor solving the travelling salesman problem [J].Neural Computing & Applications, 2016, 27(7): 1853-1866. |
| [17] |
YANG X S, MEHMET K, SIMON F. Bat algorithmfor topology optimization in microelectronic applications[C]//The 1st International Conference on FutureGeneration Communication Technologies. London,UK: IEEE, 2012: 150-155. |
| [18] |
ESLAM A H, AHMED I H, ABOUL E H, et al. Adiscrete bat algorithm for the community detectionproblem [J]. Lecture Notes in Computer Science, 2015,9129(1): 188-199. |
| [19] |
IWANKOWICZ R R. An efficient evolutionary methodof assembly sequence planning for shipbuilding industry[J]. Assembly Automation, 2016, 36(1): 60-71. |
| [20] |
PENG M. Research on assembly sequence planningbased on differential mutation bat algorithm [D]. Xiangtan,China: Xiangtan University, 2014 (in Chinese). |
| [21] |
ZENG B, LI M F, ZHANG Y, et al. Research on assemblysequence planning based on firefly algorithm[J]. Journal of Mechanical Engineering, 2013, 49(11):177-184 (in Chinese). |
| [22] |
WANG S, SUN Z Z, GUO J W, et al. Assemblysequence planning based on shuffled frog leaping algorithm[J]. Computer Integrated Manufacturing Systems,2014, 20(12): 2991-2999 (in Chinese). |
| [23] |
JIAO Q L, XU D, LI C. Product disassembly sequenceplanning based on flower pollination algorithm [J].Computer Integrated Manufacturing Systems, 2016,22(12): 2791-2799 (in Chinese). |
| [24] |
LI X. Research on assembly sequence planningbased on the genetic algorithm and application [D].Shenyang, China: Northeastern University, 2011 (inChinese). |
| [25] |
LV H G, LU C. A discrete particle swarm optimizationalgorithm for assembly sequence planning [C]//8th InternationalConference on Reliability, Maintainabilityand Safety. Chengdu, China: IEEE, 2009: 1119-1122. |
| [26] |
EBERHART R C, KENNEDY J. A new optimizer usingparticle swarm theory [C]//Proceedings of the 6thInternational Symposium on Micro Machine and HumanScience. Piscataway, NJ, USA: IEEE, 1995: 39-43. |