
Ocean Engineering Equipment and Technology››2018,Vol. 5››Issue (4): 248-251.doi:10.12087/oeet.2095-7297.2018.04.05
Previous ArticlesNext Articles
SUN Jing, WANG Chun-sheng, SHANG Chao, ZHENG Xiao-peng
Received:2018-01-03Revised:2018-03-14Online:2018-08-25Published:2018-08-20CLC Number:
SUN Jing, WANG Chun-sheng, SHANG Chao, ZHENG Xiao-peng. Localization Prototype Design of Dual-Fuel Direct-Fired Inert Gas Generator for FPSO[J]. Ocean Engineering Equipment and Technology, 2018, 5(4): 248-251.
| 1 International Maritime Organization (IMO). International code for fire safety systems [S]. 2001. 2 金晓剑. FPSO最佳实践与推荐做法[M]. 青岛: 中国石油大学出版社, 2012. Jin Xiao-jian. FPSO best practice and recommended procedures [M]. Qingdao: China University of Petroleum Press, 2012. 3 聂宝栋, 武广齐, 董丽娟, 等. 大型工程设备国产化的现状、瓶颈问题与发展思路[J]. 中国海上油气, 2013, 25(4): 54. Nie Bao-dong, Wu Guang-qi, Dong Li-juan, et al. The current state, bottleneck problem and development ideas of the localization upon large project facility [J]. China Offshore Oil and Gas, 2013, 25(4): 54. 4 刘全恩. 海洋石油工程关键设备国产化应用研究[M]. 青岛: 中国石油大学出版社, 2009. Liu Quan-en. Application research of offshore oil engineering critical equipment localization [M]. Qingdao: China University of Petroleum Press, 2009. 5 刘新福, 刘春花, 綦耀光. 煤层气井排采系统有杆泵运行特性分析[J]. 机械工程学报, 2017, 53(8): 195. Liu Xin-fu, Liu Chun-hua, Qi Yao-guang. Operating performance of sucker rod pump for the pumping system in coalbed methane wells [J]. Journal of Mechanical Engineering, 2017, 53(8): 195. 6 Pottharst J E Jr. Inert gas generator: US Patent 3,389,972 [P]. 1968-06-25. 7 MacCracken C D. Inert gas generator: US Patent 2,961,050 [P]. 1960-11-22. |
| [1] | ZHANGKai, ZHANGShousen, QIDelu.Design and Research of the Ballastand De-Ballast Systemof Semi-Submersible Production and Storage Platforms[J]. Ocean Engineering Equipment and Technology, 2022, 9(1): 15-20. |
| [2] | HAN Jing-yan, ZHAO Qiang, WU Bin-bin, JIANG Yu-fei, YUAN Guo-dong.How to Improve the Bearing Capacity of Lifting Point for Jacket Removal[J]. Ocean Engineering Equipment and Technology, 2019, 6(1): 444-449. |
| [3] | SU Jian , LIU Bao-sheng , YANG Bao-jian, MA Li, CAO Yan-guo.Application of Asymmetric Underwater Drilling Baseplate in Exploration and Development of Marginal Oilfield in Bohai[J]. Ocean Engineering Equipment and Technology, 2018, 5(5): 305-308. |
| [4] | JING Peng, ZHAO Guo-hua, YANG Qing-feng, LI Chun-lei, LIU Rong-kun.Method of Dimensional Control for Vertically Constructed Jacket[J]. Ocean Engineering Equipment and Technology, 2018, 5(5): 339-345. |
| [5] | LIU Rong-kun, YANG Qing-feng, LI Jia-jun, CAO Hong-tao, WANG Xin, WANG Tian-yi, JING Peng.Application of Three-Dimensional Coordinate System to Dimensional Control of Large-Scale Modules[J]. Ocean Engineering Equipment and Technology, 2018, 5(4): 274-277. |
| [6] | HUANG Huai-zhou, LIU Zhao, LIU Yu-xi.Research on Allowable Deflection Envelope of Barge/Yard Skidway During the Skidded Loadout of Jacket[J]. Ocean Engineering Equipment and Technology, 2018, 5(4): 278-282. |
| [7] | HE Yang.Equipment Selection for the Air-Conditioning System of Deepwater Semi-Submersible Drilling Rig[J]. Ocean Engineering Equipment and Technology, 2018, 5(3): 202-207. |
| [8] | CHEN Zi-jing.H2S Variation Trends in Produced Water Treatment System of Offshore Oil Field[J]. Ocean Engineering Equipment and Technology, 2018, 5(1): 20-23. |
| [9] | LI Long-xiang, YE Yong-biao, FU Fang-chao, XU Meng-meng, CAO Chen-lei.Research on Deepwater Pipeline Coating Removal Equipment for 2000 m Water Depth[J]. Ocean Engineering Equipment and Technology, 2018, 5(1): 63-66. |
| [10] | CHEN Rong-qi, PENG Xiao-jia.Current Status and Characteristics of Semi-Submersible Crane and Pipe-Laying Vessel[J]. Ocean Engineering Equipment and Technology, 2017, 4(6): 317-321. |
| [11] | ZHONG Wen-jun, PENG Xiao-jia, HE Ning.Outline of General Arrangement for Semi-Submersible Crane and Pipe-Laying Vessel[J]. Ocean Engineering Equipment and Technology, 2017, 4(6): 322-325. |
| [12] | HE Ning, ZHAO Dang, WANG Hui.Study on Pipeline J-Lay Analysis with Deepwater Semi-Submersible Crane J-Lay Vessel[J]. Ocean Engineering Equipment and Technology, 2017, 4(6): 326-330. |
| [13] | ZHANG Fa-fu.Dynamic Positioning Capability Analysis of Semi-Submersible Crane and Pipe-Laying Vessel[J]. Ocean Engineering Equipment and Technology, 2017, 4(6): 331-337. |
| [14] | ZHAO Jie, PENG Xiao-jia, HE Ning, AN Da-wei.Functional Requirement Analysis for the Deepwater Heavy Lifting Operation[J]. Ocean Engineering Equipment and Technology, 2017, 4(6): 338-342. |
| [15] | ZHAO Jian-yu, TANG Yi.Application of Closed-Ring Power System in Large Engineering Vessel[J]. Ocean Engineering Equipment and Technology, 2017, 4(6): 343-346. |
| Viewed | ||||||
| Full text |
|
|||||
| Abstract |
|
|||||