
Ocean Engineering Equipment and Technology››2018,Vol. 5››Issue (1): 20-23.doi:10.12087/oeet.2095-7297.2018.01.05
Previous ArticlesNext Articles
CHEN Zi-jing
Received:2017-08-21Revised:2017-09-12Online:2018-02-25Published:2018-02-06CLC Number:
CHEN Zi-jing. H2S Variation Trends in Produced Water Treatment System of Offshore Oil Field[J]. Ocean Engineering Equipment and Technology, 2018, 5(1): 20-23.
| 1 赵德喜,向安,赵东胜. 海上油田硫化氢的危害、成因及其治理方法[J]. 内蒙古石油化工, 2013(5): 30. Zhao De-xi, Xiang An, Zhao Dong-sheng. Hazards, causes and treatment methods of H2S in offshore oilfields [J]. Inner Mongolia Petrochemical Industry, 2013(5): 30. 2 周西臣,曲虎,刘静,等. 气提法去除油田污水中H2S的实验研究[J]. 工业水处理, 2012, 32(1): 66. Zhou Xi-chen, Qu Hu, Liu Jing, et al. Experimental research on the removal of hydrogen sulphide in wastewater from oilfields by gas stripping [J]. Industrial Water Treatment, 2012, 32(1): 66 3 李金林,李芳婷. 油田高含H2S采出水处理处置对策[J]. 给水排水 ,2011, 37(12): 62. Li Jin-lin, Li Fang-ting. Produced water disposal countermeasures of oilfield with high H2S content [J]. Water & Wastewater Engineering, 2011, 37(12): 62. 4 彭勃,李鹏华,谢水祥.含油污水中硫化物的处理技术[J]. 油气田环境保护, 2004, 14(3): 10. Peng Bo, Li Peng-hua, Xie Shui-xiang. Treatment technologies for oily wastewater containing sulfide [J]. Environmental Protection of Oil & Gas Fields, 2004, 14(3): 10. 5 国家海洋局. GB 4914—2008.海洋石油勘探开发污染物排放浓度限值[S]. 2008. State Oceanic Administration. GB 4914—2008. Effluent limitations for pollutants from offshore petroleum exploration and production [S]. 2008. |
| [1] | ZHANGKai, ZHANGShousen, QIDelu.Design and Research of the Ballastand De-Ballast Systemof Semi-Submersible Production and Storage Platforms[J]. Ocean Engineering Equipment and Technology, 2022, 9(1): 15-20. |
| [2] | HAN Jing-yan, ZHAO Qiang, WU Bin-bin, JIANG Yu-fei, YUAN Guo-dong.How to Improve the Bearing Capacity of Lifting Point for Jacket Removal[J]. Ocean Engineering Equipment and Technology, 2019, 6(1): 444-449. |
| [3] | SU Jian , LIU Bao-sheng , YANG Bao-jian, MA Li, CAO Yan-guo.Application of Asymmetric Underwater Drilling Baseplate in Exploration and Development of Marginal Oilfield in Bohai[J]. Ocean Engineering Equipment and Technology, 2018, 5(5): 305-308. |
| [4] | JING Peng, ZHAO Guo-hua, YANG Qing-feng, LI Chun-lei, LIU Rong-kun.Method of Dimensional Control for Vertically Constructed Jacket[J]. Ocean Engineering Equipment and Technology, 2018, 5(5): 339-345. |
| [5] | SUN Jing, WANG Chun-sheng, SHANG Chao, ZHENG Xiao-peng.Localization Prototype Design of Dual-Fuel Direct-Fired Inert Gas Generator for FPSO[J]. Ocean Engineering Equipment and Technology, 2018, 5(4): 248-251. |
| [6] | LIU Rong-kun, YANG Qing-feng, LI Jia-jun, CAO Hong-tao, WANG Xin, WANG Tian-yi, JING Peng.Application of Three-Dimensional Coordinate System to Dimensional Control of Large-Scale Modules[J]. Ocean Engineering Equipment and Technology, 2018, 5(4): 274-277. |
| [7] | HUANG Huai-zhou, LIU Zhao, LIU Yu-xi.Research on Allowable Deflection Envelope of Barge/Yard Skidway During the Skidded Loadout of Jacket[J]. Ocean Engineering Equipment and Technology, 2018, 5(4): 278-282. |
| [8] | HE Yang.Equipment Selection for the Air-Conditioning System of Deepwater Semi-Submersible Drilling Rig[J]. Ocean Engineering Equipment and Technology, 2018, 5(3): 202-207. |
| [9] | LI Long-xiang, YE Yong-biao, FU Fang-chao, XU Meng-meng, CAO Chen-lei.Research on Deepwater Pipeline Coating Removal Equipment for 2000 m Water Depth[J]. Ocean Engineering Equipment and Technology, 2018, 5(1): 63-66. |
| [10] | CHEN Rong-qi, PENG Xiao-jia.Current Status and Characteristics of Semi-Submersible Crane and Pipe-Laying Vessel[J]. Ocean Engineering Equipment and Technology, 2017, 4(6): 317-321. |
| [11] | ZHONG Wen-jun, PENG Xiao-jia, HE Ning.Outline of General Arrangement for Semi-Submersible Crane and Pipe-Laying Vessel[J]. Ocean Engineering Equipment and Technology, 2017, 4(6): 322-325. |
| [12] | HE Ning, ZHAO Dang, WANG Hui.Study on Pipeline J-Lay Analysis with Deepwater Semi-Submersible Crane J-Lay Vessel[J]. Ocean Engineering Equipment and Technology, 2017, 4(6): 326-330. |
| [13] | ZHANG Fa-fu.Dynamic Positioning Capability Analysis of Semi-Submersible Crane and Pipe-Laying Vessel[J]. Ocean Engineering Equipment and Technology, 2017, 4(6): 331-337. |
| [14] | ZHAO Jie, PENG Xiao-jia, HE Ning, AN Da-wei.Functional Requirement Analysis for the Deepwater Heavy Lifting Operation[J]. Ocean Engineering Equipment and Technology, 2017, 4(6): 338-342. |
| [15] | ZHAO Jian-yu, TANG Yi.Application of Closed-Ring Power System in Large Engineering Vessel[J]. Ocean Engineering Equipment and Technology, 2017, 4(6): 343-346. |
| Viewed | ||||||
| Full text |
|
|||||
| Abstract |
|
|||||