Ocean Engineering Equipment and Technology››2023,Vol. 10››Issue (2): 37-42.doi:10.12087/oeet.2095-7297.2023.02.06

Previous ArticlesNext Articles

Study on Interface Principal for Topside of General FPSO

LIU Yanming, HU Rong, GUO Guosheng, YE Yongkun, WU Zhikun

  1. Offshore Oil Engineering Co . , Ltd . , Tianjin 300450 , China
  • Online:2023-07-02Published:2023-07-02

Abstract:Firstly, the purpose of study on interface principle for topside of FPSO is introduced; Secondly, the typical main process scheme, general arrangement, structure scheme are illustrated; Thirdly, the interface between FPSO topside and Hull/Subsea are analyzed and demonstrated, including the interface about process, general area, structure, EIT. Finally, it is prospected how to proceed the interface principal study in the future.

Key words:general scheme,topside,interface principal,process scheme,general arrangement,structure connection

Baidu
map