Ocean Engineering Equipment and Technology››2022,Vol. 9››Issue (1): 52-57.doi:10.12087/oeet.2095-7297.2022.01.09

Previous ArticlesNext Articles

Engineering Criticality Assessment of Key Joint for Hull Structure of Semi-Submersible Floating Production Unit

  1. 1.HainanBranch,ChinaNationalOffshoreOilCorporation,Zhanjiang524057,China; 2.ZhanjiangBranch,SafetyandHealthTechnologyCo.,Ltd.,ChinaNationalOffshoreOil Corporation,Zhanjiang524057,China
  • Online:2022-09-30Published:2022-07-21

Key words:semi-submersible floating production unit (FPU),engineering criticality assessment (ECA),fatigue,fracture mechanics

CLC Number:

Baidu
map