| 1 张孝卫,刘玉玺,尹汉军,等.导管架对接结构的设计要点[C].第16届中国海洋(岸)工程学术讨论会论文集,2013: 171. Zhang Xiao-wei, Liu Yu-xi, Yin Han-jun, et al. Key points of jacket docking design [C]. Proceedings of the 16th China Ocean and Coastal Engineering Symposium, 2013: 171. 2 耿亚楠.半潜式钻井平台安装水下井口基盘技术分析[J].船海工程,2014,43(6): 122. Geng Ya-nan. Installation technology of the subsea template using semi-submersible drilling platform [J]. Ship & Ocean Engineering, 2014,43(6): 122. 3 刘竞,刘锦昆,李喆,等.新型水下井口基盘模型试验及数值分析[J].中国海洋平台,2009,24(4): 33. Liu Jing, Liu Jin-kun, Li Zhe, et al. Numerical analysis and model test for new subsea wellhead base structure [J]. China Offshore Platform, 2009,24(4): 33. 4 崔书杰,冯春健,路国章,等.井口平台的新型水下基盘结构及其模型分析[J].石油工程建设,2006,32(4): 37. Cui Shu-jie, Feng Chun-jian, Lu Guo-zhang, et al. Application of new type subsea template in wellhead platform in Chengdao Oilfield [J]. Petroleum Engineering Construction, 2006,32(4): 37. 5 郭庆,宋青武,宋波,等.深水导管架海上安装水下基盘对接模拟计算及施工工艺[J].船海工程,2016,45(4): 67. Guo Qing, Song Qing-wu, Song Bo, et al. On docking simulation and technology for the deep water jacket docking with subsea template [J]. Ship & Ocean Engineering, 2016,45(4): 67. 6 魏佳广,韩士强,刘吉林.较深水导管架对接水下井口基盘的关键技术研究及工程应用[J].海洋技术学报,2017,36(2): 95. Wei Jia-guang, Han Shi-qiang, Liu Ji-lin. Gordian technique research and engineering application of the docking between deep-water jacket and underwater wellhead template [J]. Journal of Ocean Technology, 2017,36(2): 95. 7 韩士强,魏佳广,刘吉林.文昌19-1N油田导管架安装技术[J].海洋工程,2014,32(5): 85. Han Shi-qiang, Wei Jia-guang, Liu Ji-lin. Installation techniques of WC19-1N jacket [J]. The Ocean Engineering, 2014,32(5): 85. 8 杨小龙,高定全,董宝辉,等.T型驳运载超大型组块运动特性分析[J].船海工程,2013,42(1): 129. Yang Xiao-long, Gao Ding-quan, Dong Bao-hui, et al. Motion characteristic for transportation of ultra-large topside with T-shape barge [J]. Ship & Ocean Engineering, 2013,42(1): 129. 9 American Petroleum Institute. API RP 2A-WSD. Recommended practice for planning, designing and constructing fixed offshore platforms: working stress design [S]. 2000. 10 王文娟,王树青,李思强.海洋平台浮托安装的数值实验研究[J].中国海洋大学学报,2013,43(3): 86. Wang Wen-juan, Wang Shu-qing, Li Si-qiang. Numerical based AQWA simulation of float-over installation for offshore platform [J]. Journal of Ocean University of China, 2013,43(3): 86. 11 许鑫,杨建民,吕海宁.导管架平台浮托法安装的数值模拟与模型试验[J].开云网页登录 学报,2011,45(4): 439. Xu Xin, Yang Jian-min, Lü Hai-ning. Experimental and numerical analysis for floatover installation on jacket [J]. Journal of Shanghai Jiao Tong University, 2011,45(4): 439. 12 杨晓刚.导管架与基盘导向桩的对接数值模拟分析技术[J].中国海上油气(工程),2001,13(2): 17. Yang Xiao-gang. Docking analysis of jacket to template docking pile [J]. China Offshore Oil and Gas (Engineering), 2001,13(2): 17. 13 杨晓刚.导管架与基盘导向桩的对接技术分析[J].中国海洋平台,2001,16(3): 21. Yang Xiao-gang. The joint technique of jacket template guiding plate [J]. China Offshore Platform, 2001,16(3): 21. 14 Det Norske Veritas. Rules for planning and execution of marine operations [S]. 1996. 15 Nobel Denton. Guidelines for lifting operations by floating crane vessels [S]. 2002. |